Designing a hose production batch record

Short answer

A production batch record links the assemblies prepared under the same production conditions and the components used. Batch information does not replace individual hose identifications; it serves to show which products share a common source.

Source: S017

Technical explanation

In hose assembly, component and process traceability provides data for failure or change investigations. The manufacturer's safety and maintenance approach supports correct identification of the product and preservation of records. The batch model proposed here links the hose batch, fitting/ferrule batches, drawing revision and production inspection. Not every product made on the same date must automatically be treated as the same technical batch; the company's batch-forming rule should be written down.

Source: S017

Topic-specific checkpoints

ItemDescription
Common attributeProduct and production revision
ComponentsHose, fitting and ferrule batches
Individual unitsHose identifications linked to the batch
HistoryChange and inspection records

Source: S017

How to evaluate it in practice

In the batch record, keep the order, product revision, length, quantity, A/B ends and the component batches used. When a component or instruction changes, apply a clear rule on whether to continue with the current batch. Link individual inspection results to the identification of the relevant physical hose. In a recall investigation, it should be possible to query which assemblies used the same component. If records are updated later, the previous information and the reason for the change must be preserved; documentation gaps must not be filled with estimated data.

Original editorial recommendation; not a clause of a standard.

Frequently asked questions

Does a batch number mean giving all hoses the same serial number?

No. A batch identifies a common production group, while an individual serial number identifies the physical unit.

Source: S017

Source coverage

  1. S017
    Parker Safety Guide, Publication 4400-B.1 Parker Hannifin · accessed 2026-10-20 PDF page 4; 5.1 Maintenance Programme, 5.2 Visual Inspection, 5.3 Other Inspection and 5.6 Hose Inspection and Failure | PDF page 3; 3.1 Component Inspection, 3.2 Hose and Fitting Assembly and 3.3 Related AccessoriesPDF page 2; 2.8 Routing, 2.10 Mechanical Loads and 2.11 Physical DamagePDF page 3; 3.1 Component Inspection, 3.2 Hose and Fitting Assembly and 3.3 Related Accessories

A165 · Revision 5 · Content date 2026-10-20 · Published 2026-10-20 · Translated from the Turkish original.